I decided to put all the cells in parallel and apply a very gradual charge to equalize the pack. They sat connected to a 1A charger for almost a week. Voltage rose by only a couple of hundredths (3.27 to 3.30), but now I know the cells are all balanced.
Cells assembled into the frame in a 2P25S arrangement. I used a stainless threaded rod (4 places), with Allen Nuts on either end to keep the frame tight against the cells.
Time to strart making busbars. I used 1/8" x 3/4" Aluminum flat stock. Cut, scribe, punch, pilot drill, drill, chamfer, file. Repeat 40 or so times.
Getting there - lots of fasteners to install
Pack is finally assembled. Entire thing weighs in at 62.74 lbs.
It was a very tight fit to get the pack installed into the bike. But it looks awesome.
No comments:
Post a Comment