Not riding sure is going to make for a long winter, but hopefully I will be able to use the time to get some details finished on the bike.
CONVERSION OF A '91 GSXR 750 TO AN ELECTRIC VEHICLE (EV). The goal of this painfully slow process is not just a running EV Motorcycle, but a mechanical kit that will let others readily convert their own GSXR.
Sunday, October 30, 2011
One Last Ride
Not riding sure is going to make for a long winter, but hopefully I will be able to use the time to get some details finished on the bike.
Monday, July 25, 2011
First Day of School
Dressed in his new school clothes
Here he is playing with other moto-kids on the play ground. Seems to be fitting in with the others, but still I worry.
Monday, July 11, 2011
Assembling and Installing the New Pack
Saturday, June 18, 2011
3D Reality
A little hard to see in this picture, but the print head looks like it came from an InkJet printer.
Monday, February 14, 2011
Visions of Battery Holders
My first though was to machine a thick plate of Plexiglass. Unfortunately, with each additional feature I machine, the odds of botching it go up exponentionally. 50 holes, 50 counterbores, multiple slots.... do the math. Not great odds of success.
Enter in Fused Deposition Modeling (FDM), more commonly referred to as "3D Printing". Essentially slicing a model into very thin layers and printing the plastic one layer at a time. The great thing about FDM is that the part is very functional, yielding almost full strength compared to a molded part. The downside to the process is that surface finish can be a little rough, but that is not critical for my application. The other stumbling block is that you need to have access to a fairly expensive FDM machine, or know somebody who does.
Monday, January 17, 2011
Headway Pack 2.0
Wednesday, December 29, 2010
Holiday Inn
Time seems to be a rare commodity lately. I had to cover up El Gixxer for the winter to keep the other garage projects from contaminating the old boy. A sad state of affairs. Prior to my Winter break I had the 25 Headway cells installed and did a series of test rides to see how they faired. To say I'm impressed is a gross understatement. 25 of these 16AH batteries are 50 lbs. lighter than the 17AH lead units they replaced, but put out way more juice.
Not wanting to damage the cells, I needed to keep my current draw under 10C (160 Amps). I borrowed a clamp meter and did some riding to calibrate my wrist. Turns out 150 Amps accelerates the bike pretty well, and maintaining the top speed of 48mph only takes about 50-60 Amps. I started out at 5.0 miles, and worked my way up 10.2 miles on the last trip, which happens to be 0.2 miles longer than my round trip commute. With the average voltage of the cells starting at 3.40 I finished at at average voltage of 3.24. Plenty of juice to get to work and back. But having spent all funding on batteries, I was out of cash to finish up the 12V wiring. Tuesday, September 14, 2010
From the Ashes...
Epiphany: If I use a cylindrical cells, I can put together a modular pack that will handle my daily commute with a lower initial cost. I may need to charge at work, and watch my Amps carefully, but at least I will be on the road. As funds allow, I can add more batteries. Sure, the $/AH will be higher, but if my goal is decent acceleration and a 10.0 mile round trip, this really makes sense.
Big Break #1: One of the guys on ElMoto.Net was selling a 72V charger made for Headway batteries. It was a bargain so I jumped at it, thinking it could be used for any LiFePO4, and even temporarily for SLA's, if I stay that route a little longer.
Big Break #2: Headway comes out with a new bigger cells (40160S). These 16AH cylindrical cells will do 5C continuously and 10C for 30 seconds.
Big Break #3: Manzanita Micro starts carrying Headway cells. A reputable US based supplier is critical. They are a long time player in the EV industry and have a terrific reputation for service.
So I dropped a small fortune on 25 cells, bus bars and holders. Only problem now is all the empty space that is left.
Up In Smoke

Friday, July 2, 2010
Back in Black
Tuesday, June 22, 2010
DIY tail
Monday, June 7, 2010
No longer Flying Blind (sort of...)
Sunday, April 25, 2010
Earth Day
This video doesn't have much of the EV's in it, but I neglected to take any pictures (doh!), so I can only blame myself.
Earth Day Video
The Earth Day experience has inspired met get this thing road-worthy. I need to start securing the batteries in the racks so they don't shift around. First on the list is a Guard for the left side of the Upper Battery Tray - to keep the batteries from falling out.
Sunday, April 4, 2010
Performance Corrections & Wiring Cleanup
Saturday, March 13, 2010
Frankenstein Rides Again
Technically, I've got dozens of things to finish up before El Gixxer is road worthy, but I just can't wait. In EV Motorcycle lingo the first ride has been coined "Frankenstein Mode". Components are are jury rigged and zip tied just good enough to get you down the block. It's not pretty but it works.
Acceleration with my 17AH battery pack is pathetic, and top speed seems to be about 20MPH. Nevertheless, it was just as thrilling as hitting triple digits on any other bike.
After four trips down my street and back (probably 1.5 miles total) the batteries were definately done, but it was enough to put that mile-wide EV grin on my face.
Friday, March 12, 2010
It's Alive
The Alltrax had the the LED indicating green, but when I twisted the throttle gently nothing happened. Fully opening the throttle turned the LED red. Panic!
I then realized I hadn't engaged the contactor. A flip of the switch and the contactor clicked closed. Now the rear wheel spins happily in response to my twisting wrist.
Cue Oingo Boingo's song "Weird Science"
Thursday, March 4, 2010
Burn Notice
The damage to the terminal and the nearby finger were minor. But I think another helping of caution pie will do me some good.
Monday, March 1, 2010
Vanity and Power
I started playing with the battery layout. The six 17AH units fit with room to spare in the upper battery tray. The maze of wires is starting to hit home.
The "dedicated charger for each battery" scheme has one serious drawback - cable management. Where am I supposed to stuff these things?
Sunday, February 28, 2010
A Place To Call Home
I really liked the previous location under the tank. Because it was toward the rear of the steel tank, it shielded the rider from a meltdown. So my plan is basically put it in the same place, but a little higher to clear the battery tray fasteners.
I found a cool piece of 3/8" thick acrylic in a salvage pile. It had several holes cut into it, probably to hold or display something. Perfect for mounting the electrical components, however, not strong enough to hold the controller. But it was so cool looking, so I had to use it.
I trimmed the Acrylic to fit the front 3/4 of the frame opening. Conveniently a couple of threaded inserts were already located on the front edge (formerly for some rubber pads to support the tank). I drilled and tapped a few more spots on the frame rail to finish securing the piece.
I trimmed a scrap of 3/8" aluminum plate(leftover from my motor mounts) to span the frame rails and support the controller. Some creative filing and grinding was required to work around the welds. A few drilled and tapped holes later, the controller is mounted.
Thursday, February 18, 2010
Lost in the Electric Forest
The old saying goes: "hard to see the forest for the trees" (or something like that). It's now clear to me that I'm getting bogged down in details but not making any progress. So, I'm going to focus on getting things running without wasting too much money. (wait have I said that before?)
I have these B&B 17AH SLA batteries sitting in my garage, salvaged from a Data Center UPS. From the start, I've wanted to use them to get educated and test things out, but hadn't figured out the charging method that would worlk for them and Lithum. Occasionally I hook them up to my Battery Tender Plus, to keep them in shape, but there is no way I'm putting six of those on the bike, just for short term use. Fortunately, one of my brethren on El Moto was selling six of the ACI SuperChargers at a reasonable price.
After getting the chargers, I plugged them all in to make sure they are charging properly. Now I'm taking turns connecting one of the Gixxer's headlamps to each battery for about 30 minutes, then connecting the charger and a volt meter to observe the charging cycle.
































